REFURBISHMENT OF DAVID LLOYDS WICKWOODS

REFURBISHMENT OF DAVID LLOYDS WICKWOODS

Refurbishment of

David LLoyds Wickwoods

February 2025

The Brief

This was an existing club that needed modernisation. The works were to take place in a live environment over 2 stages. The 1st phase was to modernise the gymnasium, changing rooms, spin studio, pool, sauna and jacuzzi.  It was a particularly difficult project as the buildings were old and had been added to sporadically over the years – with no real thought behind the additional installations.

Refurbishment 1st Phase David Lloyds

We were asked to take out walls in the gymnasium to make a larger, more open planned space. This involved a lot of propping for the roof and removal of wall. Padstones were put in place alongside new beams to support the roof. New flooring was installed, along with a new ceiling. We also upgraded the electrics and air conditioning and re-decorated general areas.

The changing rooms were made bigger, along with new showers, lockers and toilets. All walls and floors were tiled.

A spin studio was formed in part of the old treatment room with acoustics, electrics and air-conditioning.

Finally, the spa area was completely modernized with new tiling in all areas, including the pool and steam room. We also installed a new sauna with Himalayan salt blocks.