September 2023
This was a park that we originally fitted out by Oakwhite, after 6 years is in needed refurbishing.
To make the park much more inviting with special features, upgrading of facilities and decorations.
The whole unit has been decorated including over the trampolines. Trampolines had to be protected from overspray. The kitchens have been upgraded with new equipment. New wall coverings and ceilings. The entrance to the park has been changed with an excite tunnel along with LED lighting circulating the tunnel. The party rooms decorated and new floor coverings. Café counter upgraded along with all mechanical and electrical. New activities installed clip n climb and a area for climbing and slides for younger children.
The project was 8 weeks during term time and had to be open for the next holiday.